Project: Geek   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Gary Phenning   -  
Project:   Kitfox - Series 7   -   VIEW REPORTS
Total Hours:1393.7
Total Flight Time:0.4
Start/Last Date:Mar 06, 2021 - Apr 06, 2024
Engine:Rotax 912is
Propeller:Whirlwind
Panel:Garmin G3x
 
Friendly URL: https://eaabuilderslog.org?s=Geek

Home or Last Project Picture

Aug 16, 2022     Elevator and Gear Fairings - (10 hours)       Category: Tail Feathers
My elevator is covered. Still need to do the finishing tapes but the major part is done. While waiting for the glue to dry on the Oratex, I started fitting the fairings on the landing gear struts. You cut the fairing part lengthwise to wind up with a front and rear fairing. The table saw made short work of that. Gotta like a good carbide blade for that kind of stuff. Got the fairings pretty much dialed in and started Hysoling the fitted fairings to the struts. This will be one of those things that when I get to that part in the instructions, the parts will be ready to go. I had made a bunch of stuff like that over the Winter so when I got to them this summer, it was really nice to just go to the box and get the part - all good to go.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.